31. Chashma Nuclear Plant was connected to the national grid in
(a) 2001
(b) 2000
(c) 2002
(d) 1999
32. What is the producing capacity of electricity of Ghazi Barotha dam?
(a) 1250 MW
(b) 1350 MW
(c) 1425 MW
(d) 1450 MW
33. What is the installed power generation capacity of Neelum Jhelum Hydroelectric Project?
(a) 1400 MW
(b) 543 MW
(c) 176 MW
(d) 969 MW
34. What will be the installed power generation capacity of Tarbela 4th Extension?
(a) 876 MW
(b) 1534 MW
(c) 1410 MW
(d) 1234 MW