21. What is the total hydroelectricity production in Pakistan?
(a) 5635 MW
(b) 6555 MW
(c) 4532 MW
(d) 5163 MW
22. What is the potential capacity of hydroelectricity production from river Indus, Jhelum, and Chenab?
(a) 35000 MW
(b) 36000 MW
(c) 30000 MW
(d) 38000 MW
23. What is the share of Tarbela in the total hydroelectricity production of Pakistan?
(a) 70%
(b) 65%
(c) 80%
(d) 55%
24. What is the installed hydroelectricity generation capacity of Tarbela?
(a) 3478 MW
(b) 3378 MW
(c) 3578 MW
(d) 3278 MW
25. When did Karachi Nuclear Power Plant start its operation?
(a) 1980
(b) 1979
(c) 1975
(d) 1971
26. What is the power generation capacity of Karachi Nuclear Power plant?
(a) 139 MW
(b) 137 MW
(c) 136 MW
(d) 138 MW
27. Which is the second Nuclear plant of Pakistan?
(a) Karachi nuclear plant
(b) Chashma nuclear plant
(c) Kahuta nuclear plant
(d) Islamabad nuclear plant
28. The Chashma Nuclear plant was built with the help of
(a) France
(b) Germany
(c) Canada
(d) China
29. Chashma Nuclear plant is located near Chashma Barrage at
(a) Mithan Kot
(b) Mianwali
(c) Dera Gazi Khan
(d) Tarbela
30. What is the installed capacity of Chashma Nuclear Plant l?
(a) 3.20 MW
(b) 32.8 MW
(c) 3.25 MW
(d) 3.10 MW